Winning an order opens a relationship. Keeping that buyer takes work from both sides. Samples, changes, production and payment all test the relationship. A good price helps. So does evidence that the next order can be made to the agreed standard within the time available.

Part 1 followed a hypothetical buyer from an early visit to a more complex sourcing arrangement. It raised four questions. Who wins an order, and what keeps a buyer? Which factory skills matter, and where can public policy help? The answers below keep the buyer's needs and the factory's costs in view.

There is no single model for every Bangladesh garment business. A repeat knitwear programme differs from a small fashion order. The cases here are examples, and the dated industry figures are attributed to the bodies that report them.

1. Who wins the order?

A supplier needs to be able to make the product and fulfil the terms. The lowest quote cannot resolve a safety failure. It cannot supply missing machinery or create space in a full production plan. Buyers may screen suppliers before inviting quotes, or assess capability and cost together. Ask how that buyer makes the decision.

The first useful discussion is about the order itself. Confirm its fabric, construction, tests, size mix, quantity and delivery point. Then ask which factory and any outside processes will do the work. A good development sample is useful evidence. Bulk capacity needs its own review.

A practical supplier review can separate approval conditions from commercial choices.

Review area

Evidence to examine

Decision it supports

Product capability

Relevant samples, process trials and test results

Can the site make this product?

Capacity

Current loading and the proposed production route

Can it make the quantity in the required period?

Quality controls

Material approval, process checks and traceable records

Can it repeat the result?

Responsible business conduct

Relevant assessments, worker input and action records

What risks require action or further review?

Commercial terms

Matching quote scope, payment and change terms

Is the offer workable for both parties?

These areas are linked, but they should not collapse into one score that hides a serious failure. A small price advantage does not cancel an unmet requirement. Once the necessary conditions are met, a buyer can compare the remaining differences with clear judgment.

The OECD garment and footwear guidance treats supplier assessment as part of ongoing due diligence. The work includes finding and addressing risks of harm. Approval is therefore a starting point, rather than proof that future orders need no review.

What a green-building certificate can tell a buyer

Bangladesh's green garment factories are a relevant part of its sourcing offer. In its report dated 18 July 2026, BGMEA reported 290 LEED-certified factories. Its environment page, checked on 22 October 2026, reported 291. That page also placed 53 of the world's top 100 green garment factories in Bangladesh. It gave no clear update date for that ranking.

Those are BGMEA's figures, with different reporting dates. They should not be presented as an undated count that will remain current. Nor should an industry total be used to imply that a particular supplier holds a certificate.

USGBC describes LEED as a green-building rating system. Its routes vary with building type and project stage. A buyer should verify the actual project, rating and scope. A building certificate does not settle garment quality, labour conditions or every current safety risk.

For the site being considered, examine the relevant evidence. A hazard and risk assessment and its controls remain part of running a safe factory. The commercial team also needs an honest view of cost and capacity. No one certificate answers all of these questions.

Compare cost on a common basis

CPM, or cost per minute, is useful only when its scope is known. One rate may cover sewing alone. Another may include cutting, finishing and shared overhead. Adjust for scope before comparing them. Achieved efficiency and the period behind the rate also matter.

The garment costing guide shows how cost per earned standard minute becomes conversion cost. It does not produce one correct price for all factories. A high rate may reflect a wider cost pool or lower output; a low rate may omit a cost that the supplier must still pay.

The buyer can ask for enough detail to understand the offer. A difference does not always mean excess margin. The factory can show its work and identify which changes would make a lower price feasible. That is a stronger discussion than bargaining over an unexplained final number.

2. What keeps a buyer?

A buyer needs reasons to place the next order. Good quality and useful product advice can help. So can reliable dates and clear handling of problems. None guarantees retention when demand, strategy or the product mix changes.

Price still matters. Suppose a competing bid is two cents lower on 100,000 garments with matching scope. The direct saving is $2,000. If moving the order requires $1,800 of new development and $400 of extra checking, those assumed costs total $2,200. On that first order, they exceed the price saving by $200.

This example does not prove that staying is better. The new supplier might offer a lasting advantage across several seasons. It does show why a two-cent difference needs a full comparison. Use known costs where available and label uncertain risks instead of inventing a precise loss figure.

Make performance easy to judge

A useful factory dashboard shows what was promised, what happened and why a gap remains. Definitions matter as much as the display. “On time” could mean ex-factory release, loading on board or arrival at the buyer's warehouse. Those are different events.

If 18 of 20 shipments arrive by the agreed date, the shipment-based on-time rate is 90%. That says nothing about whether the two late shipments carried most of the volume. A unit-based measure answers another question. Keep both definitions clear when the order mix makes that distinction useful.

Quality measures also need context. Record the quantity checked, inspection stage and defect basis. An inspector's findings on a sample are not the same as a customer return rate. A sudden improvement deserves review if the style mix or checking method changed.

The response to a problem is part of performance. An early warning with affected quantities and realistic options gives the buyer room to act. Repeated assurances without supporting facts use up that room. Report a known threat to the order. Do not wait to settle every detail of its cause.

Review the buyer's part of the process

The factory does not control every source of disruption. Late approvals, changing quantities and delayed payments can affect the plan. A fair relationship review considers those events alongside factory delays.

Cascale's Better Buying index reviews several areas. They include planning, cost, payment, development and order placement. It brings the supplier's view to those choices. Buyer decisions can affect the conditions in which garments are made.

An order review can track the complete specification and approval dates. It can also show how changes affected the plan. It should also show which actions the supplier controlled. This gives both sides a basis for improving the next order instead of trading general complaints.

Distinguish a forecast from a commitment

A buying house might keep three or four approved factories available for a style. That is an example, not a fixed industry rule. Several sources can give the buyer more capacity options. They may also reduce disruption risk. Work sent to each site can vary.

The factory needs to know which quantities are firm. A forecast can support material planning without authorising purchase. A reserved production slot may need its own terms. Agree when a forecast becomes an order and how changes are handled. Decide who bears the agreed costs of committed material.

Stable planning does not require pretending that demand is certain. It requires making uncertainty visible early enough for the parties to respond. A factory should be cautious about expanding fixed capacity on the strength of informal promises alone.

3. Which factory skills help the relationship last?

Three areas deserve close attention: material supply, safe work and reliable management systems. Their value depends on the product, scale and risks of the business. The factory has several ways to strengthen these areas. It need not own every process or buy the largest software package.

Buyer meeting area with garment samples

Material supply and backward linkage

A group that spins yarn or makes fabric has more direct control over some supply decisions. It also takes on the costs and risks of those operations. Raw materials, energy, skilled staff, capital and working cash remain necessary.

Compare in-house work with an outside partner on the same basis. Use the same specification and usable output. Include development, quality losses, transport, stock and the time that cash remains tied up. A quoted fabric rate alone may miss a costly approval delay or an unusable shade balance.

For example, a mill offering a lower rate may require a much larger minimum lot. The extra fabric can be valuable if there is a firm repeat order. If the style may end, the same stock can become a burden. The right decision depends on demand and the chance of reuse, rather than the ownership of the mill.

A smaller factory can build reliable supply with outside partners. Clear specifications, sound selection and shared schedules help. It needs a backup plan for critical inputs and an honest view of how quickly that backup can qualify. Both suppliers may depend on the same material. If that material is unavailable, the backup may fail too.

Inventory rules also need sound inputs. An EOQ or periodic review policy should use credible demand, lead-time and stock records. The formula cannot correct missing receipts or material that appears available but is on hold.

Safety as continuing work

Rana Plaza collapsed on 24 April 2013. The ILO's ten-year review reports that more than 1,100 people died. That history must not be reduced to a sentence about improving buyer confidence. The purpose of safety work is to protect people.

The Accord and Alliance were separate initiatives formed after the disaster. On 1 June 2020, the Accord office functions in Bangladesh moved to the RMG Sustainability Council. The International Accord records this transfer. That transfer was not a merger of the Accord and Alliance.

A factory's current responsibilities need current evidence. An old assessment has limits. A new layout, building change or electrical load needs its own safety review. Review findings, completion evidence and unresolved risks through the applicable process. Workers also need a trusted way to raise concerns and receive a response.

The factory's daily routines should support the approved controls. Fire safety and compartmentation planning needs technical judgment. It must fit the actual building and use. A successful shipment or audit does not remove the need to maintain those controls afterward.

Systems that survive a person's absence

A capable merchandiser can rescue an order. The business is still at risk if only that person knows its key facts. The next colleague should be able to find the current approval, material status and reason for a hold.

SOPs, or standard operating procedures, define how the work is done and checked. They should be short enough to use, current enough to trust and supported by practice. A revision owner must ensure that the floor uses the right instruction after a change.

ERP, or enterprise resource planning, can link order, stock, production and finance records. It depends on timely, correct entries. If stores posts a receipt against the wrong order, a neat screen can still produce a bad material plan.

BGMEA called for technology upgrades in its November–December 2025 newsletter. A factory still needs to test a proposed system against its own work. Choose a pilot that answers a concrete question. Can staff find shortages sooner? Can they reconcile issued material with less repeated entry?

Measure the pilot's benefit alongside its cost. Include setup, training, support and time spent correcting data. A faster report has value when it changes a decision. Speed alone does not establish a financial return.

The same principle applies to a Kanban pull system. Cards or digital signals can regulate releases between cutting and sewing. Both need clear quantities, quality status and response rules. The tool supports the process that people agree to follow.

Connect operations with the supply chain

Operations management plans and controls work inside the factory. Supply chain management connects material sources, outside processes and delivery across firms. A shortage crosses both areas, so the teams need a shared set of facts and clear decisions.

Imagine that most fabric for an order has arrived, but one colour remains unapproved. A report showing only the total metres received can make the order look ready. Cutting needs to know which metres are usable for each colour and size plan. Merchandising needs to know whether the buyer has received the approval request. Planning needs the likely release date before it commits the line.

The useful record therefore follows the constraint, not just the total quantity. It names the missing approval and the work affected. It also names who can resolve it and the latest decision date. If shipment is at risk, the buyer can assess options. These might include a new sequence or an agreed split delivery.

Each option has a cost and an effect on the plan. Splitting an order may add transport and handling. Changing the sequence may require another setup. The team should compare these effects and record the chosen action. The shared facts can then guide a decision. A late report may arrive after the problem has spread.

4. Where can government policy help?

Policy can address shared obstacles that one factory cannot solve alone. Skills and reliable services deserve review. So do sound enforcement and access to suitable finance. They are proposals to assess, not promises that a particular programme will secure orders.

A common costing method can also improve understanding. It would explain which costs enter CPM and how earned minutes are measured. That differs from setting one fixed CPM for all businesses.

CPM is not a worker's wage rate. It can include several costs allocated across a defined amount of output. Factories differ in their work scope, equipment, overhead and achieved efficiency. The same method can yield different results within Bangladesh. It can also differ across Vietnam, Cambodia or India.

A policy discussion should identify the problem before choosing the instrument. If small firms cannot obtain training, a training scheme may address that gap. If poor utility service stops output, the factory loses time. Another costing template cannot restore it.

The design of support matters. Clear entry rules can help smaller firms understand whether they qualify. Simple application steps may widen access. Clear reporting can show where the funds went. Worker protection and safety duties should remain central as firms improve their operations.

Evaluation should compare the programme's cost with its stated result. For a skills scheme, attendance is one measure. The stronger test is whether people learn and use the skill at work. A scheme may install new machines. That alone does not prove better quality or lower resource use.

Industry averages and green-building counts can show one part of the picture. They cannot prove that every factory or worker benefited. Public bodies, buyers, workers and suppliers need a shared goal. They also need evidence that the change reached the intended people.

Turn the answers into the next order review

A factory needs a price that covers the agreed work and a system that can deliver it. A buyer needs clear terms, dependable evidence and a way to address risks when they emerge. An agent or buying house can support that work when its role and authority are explicit.

For the next order, review the cost basis and open risks. Identify the decisions each party must make and set their dates. Use the previous order's records to improve those choices. That gives the relationship a practical basis to continue. The parties can still disagree honestly about price or capacity.