
Kanban Pull System: Cutting-to-Sewing Handoff Guide
A step-by-step account of replacing push scheduling between the cutting room and the sewing floor with a two-bin kanban, including the card calculation and the first three weeks of failure modes.
Garment Factory Calculators and Guides
Industrial Engineer & Business Process Optimization Executive
Salauddin Ahamed Sagar is an industrial and production engineer in Dhaka, Bangladesh, specializing in ready-made garment manufacturing, ERP systems, and industrial engineering. He leads ERP and process optimization projects at Apex Holdings Ltd. and previously worked in line balancing and industrial engineering at Epyllion Group and Young Group. He holds a BSc in Industrial and Production Engineering from NITER (University of Dhaka) and founded Apparel Diary to share practical engineering methods, calculators, and factory operations guides.

A step-by-step account of replacing push scheduling between the cutting room and the sewing floor with a two-bin kanban, including the card calculation and the first three weeks of failure modes.

Embroidery waves and misplaced outlines need separate observations. This guide follows a motif through stitching, unhooping and finishing to locate the effects of loading, support, tension and digitizing.

Calculate peak steam demand for a textile plant. Compare batch timing, boiler rating conditions, feedwater, low-load duty and reserve in a worked example.

Diagnose weaving stop marks with event records, pick-spacing profiles and matched restart trials. Compare causes, measurements and machine-specific controls.

Understand loom motions through shedding, insertion, beat-up, take-up and let-off. Use examples to relate cloth density, beam radius and warp tension.

Plan internal quality audits for garment factories with risk-based coverage, independent auditors, sound evidence samples, clear findings, and useful follow-up.

You'll be able to design a factory KPI dashboard supervisors keep opening past week four, by starting from the five decisions it must support instead of the data that happens to be available.

Compare generator replacement costs over a common study period. Work through fuel, overhaul, resale, discounting and reliability assumptions in a clear case.

Most line balancing is done by eye and a stopwatch. Here is the mixed-integer formulation that does it properly, with the constraints that keep the answer feasible on a real floor.